The timetable for energy-inefficient homes
Homes rated G have been excluded from letting since 2025; those rated F will follow in 2028 and E in 2034. Your plans need to keep pace.
Law No. 2021-1104 on climate and resilience

From tenant complaints to works planning, Propelink links every intervention to the right component and every cost to the right estate.
Public housing bodies, social housing companies and cooperatives.
Homes rated G have been excluded from letting since 2025; those rated F will follow in 2028 and E in 2034. Your plans need to keep pace.
Law No. 2021-1104 on climate and resilience
Communal and private areas: surveys must be kept up to date, accessible and shared before any work.
French Public Health Code
Your strategic asset plan sets your medium- and long-term direction: it is only as good as the data behind it.
Time-stamped, classified and tracked through to closure, with actual processing times.
A contractor portal for viewing assignments and uploading reports and photos.
Deadlines, scope and providers for each contract, estate by estate.
Surveys, materials and documents mapped and available before each job.
Component condition rated and compared to identify priority estates.
Costed works scenarios aligned with your energy deadlines.

Components, surveys, interventions: your works plan is based on the actual condition of each building.
A tenant reports a fault; the request is time-stamped and linked to their home.
TenantThe manager identifies the component involved and assigns the contracted company.
ManagerThe report, photos and timescales are tracked through to closure, with the asbestos file consulted.
ContractorRecurring faults inform the estate's works plan.
Asset management department
“An overlooked component always costs more than one that is monitored. Twenty years of technical inspections taught me that, building by building.”
Thirty minutes to see Propelink applied to your portfolio.